Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
On the top left of the alignment manager, there is an option to add and delete alignments.
Once an alignment is added, it will be empty. The points can then be added to the alignment directly to the table if their coordinates are known, by importing a LandXML file or by picking points right from the point cloud, using the “Pick points” button within the “Alignments” window.
Each point picked with a left mouse button click will populate the table and a right click will terminate the function, marking the end of the alignment. These points will be added to the raw alignment tab.
Image Added
Image Added